|
|
|
|
|
|
|
|
1. |
Record Nr. |
UNINA9910458754103321 |
|
|
Autore |
Daniel David E (David Edwin), <1949-> |
|
|
Titolo |
Waste containment facilities [[electronic resource] ] : guidance for construction quality assurance and construction quality control of liner and cover systems / / David E. Daniel, Robert M. Koerner |
|
|
|
|
|
|
|
Pubbl/distr/stampa |
|
|
Reston, VA, : American Society of Civil Engineers, c2007 |
|
|
|
|
|
|
|
ISBN |
|
|
|
|
|
|
Edizione |
[2nd ed.] |
|
|
|
|
|
Descrizione fisica |
|
1 online resource (365 p.) |
|
|
|
|
|
|
Altri autori (Persone) |
|
|
|
|
|
|
Disciplina |
|
|
|
|
|
|
Soggetti |
|
Waste disposal sites - Design and construction - Quality control |
Quality assurance |
Engineered barrier systems (Waste disposal) |
Electronic books. |
|
|
|
|
|
|
|
|
Lingua di pubblicazione |
|
|
|
|
|
|
Formato |
Materiale a stampa |
|
|
|
|
|
Livello bibliografico |
Monografia |
|
|
|
|
|
Note generali |
|
Description based upon print version of record. |
|
|
|
|
|
|
Nota di bibliografia |
|
Includes bibliographical references and index. |
|
|
|
|
|
|
Nota di contenuto |
|
""Contents""; ""Preface""; ""Chapter 1. Introduction to Waste Containment""; ""1.1 Introduction""; ""1.2 Waste Generation""; ""1.3 Regulations""; ""1.4 A Generalized Waste-Containment System""; ""1.5 Natural Soil Components""; ""1.6 Geosynthetic Components""; ""1.7 Geosynthetic Clay Liners""; ""1.8 Other Components of Waste Containment Systems""; ""1.9 Importance of CQC/CQA""; ""1.10 Cost of CQA""; ""1.11 References""; ""Chapter 2. Manufacturing Quality Assurance (MQA) and Construction Quality Assurance (CQA) Concepts and Overview""; ""2.1 Introduction""; ""2.2 Responsibility and Authority"" |
""2.3 Personnel Qualifications""""2.4 Written MQA/CQA Plan""; ""2.5 Documentation""; ""2.6 Meetings""; ""2.7 Sample Custody""; ""2.8 Weather""; ""2.9 Work Stoppages""; ""2.10 References""; ""Chapter 3. Compacted Clay Liners""; ""3.1 Introduction and Background""; ""3.2 Critical Construction Variables That Affect Clay Liners""; ""3.3 Field Measurement of Water Content and Dry Unit Weight""; ""3.4 Recommended Procedure for Developing Water Content�Density Specification""; ""3.5 Inspection of Borrow Sources before Excavation""; ""3.6 Inspection during Excavation of Borrow Soil"" |
""3.7 Preprocessing of Materials""""3.8 Placement of Loose Lift of Soil""; ""3.9 Remolding and Compaction of Soil""; ""3.10 Protection of |
|
|
|
|