Inspecting pipeline installation [[electronic resource] /] / prepared by the Pipeline Division of the American Society of Civil Engineers ; edited by T.J. Hovland and Mohammad Najafi

Pubbl/distr/stampa

Reston, VA, : American Society of Civil Engineers, c2009

ISBN

0-7844-7301-3

Descrizione fisica

1 online resource (286 p.)

Collana

ASCE manuals and reports on engineering practice ; ; no. 117

Altri autori (Persone)

HovlandT. J

NajafiMohammad

Disciplina

621.8672

Soggetti

Pipelines - Design and construction

Underground construction

Electronic books.

Lingua di pubblicazione

Inglese

Formato

Materiale a stampa

Livello bibliografico

Monografia

Note generali

Description based upon print version of record.

Nota di bibliografia

Includes bibliographical references and index.

Nota di contenuto

""CONTENTS""; ""1 INTRODUCTION""; ""1.1 Targeted Readership""; ""1.2 Terminology""; ""1.3 Text Organization""; ""1.4 Emphasis on Construction Practices""; ""1.5 Sources of Information""; ""2 SOIL MECHANICS FOR PIPELINE CONSTRUCTORS""; ""2.1 Introduction""; ""2.2 Natural Soil Components""; ""2.3 Describing a Soil Mixture""; ""2.4 Groundwater""; ""2.5 Loads in a Soil Mass""; ""2.6 Soil Compaction""; ""2.7 The Geotechnical Report""; ""2.8 Pipe Stiffness""; ""2.9 Interaction of the Soil and the Pipe Structure""; ""3 DESCRIBING COMMON PROCEDURES""; ""4 OBTAINING PIPE FROM A SUPPLIER""

""5 MANAGING THE PROJECT""""6 EXCAVATION AND BACKFILLING""; ""6.1 The Major Common Work""; ""6.2 Excavation of a Pipe Trench: The First Phase of Pipeline Earthwork""; ""6.3 Other Important Earthwork Decisions""; ""6.4 Moving Earth""; ""6.5 Embedding the Pipe: The Second Phase of Pipeline Earthwork""; ""6.6 Problem Conditions during Backfilling""; ""6.7 Completing the Trench: The Third Phase of Pipeline Earthwork""; ""6.8 Notes to Inspectors""; ""7 PIPE SHIPPING AND HANDLING""; ""7.1 Controlling Pipe Delivery""; ""8 GENERAL INSTALLATION FOR ALL PIPES""; ""8.1 Basic Workplace Control""

""8.2 General Pipe Installation""""8.3 Handling and Operational Issues""; ""8.4 Mainline Connections""; ""8.5 Reaction or Thrust Blocking""; ""8.6



Connection to Structures""; ""8.7 Installation in Casings and Tunnels""; ""8.8 Other Considerations""; ""8.9 Corrosion""; ""8.10 Measurement of Pipe Deformation""; ""8.11 First Filling of Pipes""; ""9 GENERAL INSTALLATION PROCEDURES""; ""10 STEEL PIPE""; ""10.1 General Background and Discussion""; ""10.2 Product Information""; ""10.3 Linings and Coatings""; ""10.4 Pipe Shipping and Handling""; ""10.5 Installation""; ""10.6 Backfilling""

""10.7 Testing and Acceptance""""11 CORRUGATED METAL PIPE""; ""11.1 General Background and Discussion""; ""11.2 Shipping and Handling""; ""11.3 Installation of Corrugated Metal Pipe""; ""11.4 Inspection and Testing""; ""12 DUCTILE IRON PIPE""; ""12.1 General Background and Discussion""; ""12.2 Product Information""; ""12.3 A Sample Project to Describe Ductile Iron Pipe Installation""; ""12.4 Delivering Pipe to the Job Site""; ""12.5 Laying Pipe""; ""12.6 Tapping""; ""12.7 Connections to Structures""; ""12.8 Installing in Tunnels and Casings""; ""12.9 Related Topics""

""12.10 Testing and Acceptance""""12.11 Record Drawings""; ""13 PRESTRESSED CONCRETE CYLINDER PIPE""; ""13.1 General Background and Discussion""; ""13.2 Product Information""; ""13.3 Linings and Coatings""; ""13.4 Shipping and Handling""; ""13.5 Installation""; ""14 REINFORCED CONCRETE PIPE""; ""14.1 General Background and Discussion""; ""14.2 Description of Reinforced Concrete Pipe""; ""14.3 A Sample Project to Illustrate Actual Installation Work""; ""15 BAR-WRAPPED CONCRETE CYLINDER PIPE""; ""15.1 General Background and Discussion""; ""15.2 Product Information""