|
|
|
|
|
|
|
|
1. |
Record Nr. |
UNINA9910777483203321 |
|
|
Autore |
Graham Michael Dennis <1952-> |
|
|
Titolo |
Effective executive compensation [[electronic resource] ] : creating a total rewards strategy for executives / / Michael Dennis Graham, Thomas A. Roth, Dawn Dugan |
|
|
|
|
|
|
|
Pubbl/distr/stampa |
|
|
New York, : AMACOM/American Management Association, c2008 |
|
|
|
|
|
|
|
ISBN |
|
1-281-75796-9 |
9786611757960 |
0-8144-1082-0 |
|
|
|
|
|
|
|
|
Descrizione fisica |
|
1 online resource (544 p.) |
|
|
|
|
|
|
Altri autori (Persone) |
|
RothThomas A. <1949-> |
DuganDawn <1967-> |
|
|
|
|
|
|
|
|
Disciplina |
|
|
|
|
|
|
Soggetti |
|
Executives - Salaries, etc - United States |
Employee fringe benefits - United States |
Incentive awards - United States |
Compensation management - United States |
|
|
|
|
|
|
|
|
Lingua di pubblicazione |
|
|
|
|
|
|
Formato |
Materiale a stampa |
|
|
|
|
|
Livello bibliografico |
Monografia |
|
|
|
|
|
Note generali |
|
Description based upon print version of record. |
|
|
|
|
|
|
Nota di bibliografia |
|
Includes bibliographical references (p. 495-506) and index. |
|
|
|
|
|
|
Nota di contenuto |
|
CONTENTS; PREFACE; INTRODUCTION; CHAPTER 1 Business Environmental Impacts; CHAPTER 2 Key Stakeholders; CHAPTER 3 Vision, Mission, and Values; CHAPTER 4 Business Strategy; CHAPTER 5 Organizational Capabilities and People Strategy; CHAPTER 6 Total Reward Strategy; CHAPTER 7 Total Reward Architecture; CHAPTER 8 Executive Total Reward Strategy Components; CHAPTER 9 Base Salary; CHAPTER 10 Short-Term Incentives; CHAPTER 11 Mid-Term Incentives; CHAPTER 12 Long-Term Incentives; CHAPTER 13 Wealth Accumulation Incentives; CHAPTER 14 Executive Benefits; CHAPTER 15 Executive Perquisites |
CHAPTER 16 Development RewardsCHAPTER 17 Director's Pay; CHAPTER 18 Final Thoughts; CHAPTER 19 Case Study 1; CHAPTER 20 Case Study 2; CHAPTER 21 Books We Love and That Should Be on Your Bookshelf; INDEX |
|
|
|
|
|
|
|
|
Sommario/riassunto |
|
An in-the-trenches look at designing an executive rewards program that gets results. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2. |
Record Nr. |
UNINA9910346778103321 |
|
|
Autore |
Springmann Markus |
|
|
Titolo |
Auslegung eines asynchronen Langstatorlinearmotors mit groÃem Luftspalt als StraÃenbahnantrieb |
|
|
|
|
|
|
|
Pubbl/distr/stampa |
|
|
KIT Scientific Publishing, 2015 |
|
|
|
|
|
|
|
ISBN |
|
|
|
|
|
|
Descrizione fisica |
|
1 online resource (XXIII, 241 p. p.) |
|
|
|
|
|
|
Collana |
|
Karlsruher Schriftenreihe Fahrzeugsystemtechnik / Institut für Fahrzeugsystemtechnik |
|
|
|
|
|
|
|
|
Soggetti |
|
Technology: general issues |
|
|
|
|
|
|
Lingua di pubblicazione |
|
|
|
|
|
|
Formato |
Materiale a stampa |
|
|
|
|
|
Livello bibliografico |
Monografia |
|
|
|
|
|
Sommario/riassunto |
|
The present paper focuses on the concept of a linear motor for tram operation without overhead lines. The type of motor selected is an asynchronous long-stator linear motor without an adjuster. The resulting big air gap is the biggest challenge in design. First, the impacts of the big air gap are studied analytically. Then, an asynchronous long-stator linear motor for driving the tram is designed using the FE method. The simulation models are validated using a linear motor demonstrator. |
|
|
|
|
|
|
|