1.

Record Nr.

UNINA9910220099703321

Autore

Riposo Jessie

Titolo

Prolonged cycle times and schedule growth in defense acquisition : a literature review / / Jessie Riposo [et al.]

Pubbl/distr/stampa

RAND Corporation, 2014

Santa Monica, CA : , : Rand ; , 2014

ISBN

0-8330-8673-1

Descrizione fisica

1 online resource (xviii, 83 pages)

Disciplina

355.6/212

Soggetti

Armed Forces - Procurement

Lingua di pubblicazione

Inglese

Formato

Materiale a stampa

Livello bibliografico

Monografia

Note generali

Bibliographic Level Mode of Issuance: Monograph

Sommario/riassunto

This report summarizes a selection of the defense acquisition literature from the 1960s to the present on potential sources of prolonged acquisition cycle times and schedule growth, as well as potential opportunities for improvement. It presents the range of possible causes of schedule-related problems and various recommendations cited for improving schedules by various authors and organizations. This report does not provide critical analysis or an assessment of the strengths or weaknesses of the claims made in the literature. Rather, it provides a starting point for further research or consideration by government acquisition professionals, oversight organizations, and the analytic community. We identified the following reasons for schedule delays in the literature: (1) the difficulty of managing technical risk (e.g., program complexity, immature technology, and unanticipated technical issues), (2) initial assumptions or expectations that were difficult to fulfill (e.g., schedule estimates, risk control, requirements, and performance assumptions), and (3) funding instability. The most commonly cited recommendations for reducing cycle time and controlling schedule growth in the literature are strategies that manage or reduce technical risk. Some of those recommendations include using incremental fielding or evolutionary acquisition strategies, developing derivative products (rather than brand-new designs), using mature or



proven technology (i.e., commercial, off-the-shelf components), maintaining stable funding, and using atypical contracting vehicles.